Fatalities in PV operations and maintenance often come from “thinking the power is already off”. The DC side is always live under light.
The most counter-intuitive thing about PV systems:As long as the modules see light they carry voltage; switching off the inverter is not the same as de-energising.
Many accidents happen in the O&M phase rather than during installation — because operators' respect for the system has faded.
Distributed PV adds one more layer of risk: roof work. Falls from height combine with electrical risk.
| Risks | Possible consequences | Course link points |
|---|---|---|
| Assuming the power is already off | DC electric shock | Understanding the live DC side and voltage testing |
| Unprotected roof work | Falls from height | Roof work protection and walkway planning |
| Loss of control during module lifting | Struck-by-object injuries, damaged modules | Lifting plan and signalling |
| Loose connections heating up | Arc flash, fire | Connector assembly and infrared inspection |
| Carrying on work in rain | Electric shock, slipping | Weather conditions and stop-work criteria |
This table is the basis for course design: a risk with no corresponding action is a risk that has not been taught properly.
These are not hypotheticals; they recur on the training floor. Each item spells out what went wrong, what the right action is and why.
The distance between the lectern and the workbench is longer than you think. This section is about how we turn knowing into doing.
Every item can be ticked; no vague wording like 'basically mastered'. A teacher can score straight from this sheet.
| Assessment items | What counts as passing | What leads to an immediate fail |
|---|---|---|
| Voltage verification | Test the DC and AC sides at the work point | Checking only the AC side = fail |
| Fall protection | Independent anchor points, alternate hooks | No independent anchor point = fail |
| Module handling | Lift with two people, no dragging, no stepping on it | Dragging a casualty alone = points deducted |
| Connector assembly | Crimped with the dedicated tool; pull test passed | Fails if it yields to hand pressure |
| O&M inspection | Infrared temperature check, connector inspection, complete records | Missing records: points deducted |
Real sites rarely have work that belongs to only one direction. This section covers where risks compound.
| Modules | Class hours | Content |
|---|---|---|
| Systems and risks | 2 class hours | PV system composition, differences in DC/AC-side risk |
| Electrical safety | 2 class hours | String voltage calculation, voltage testing methods, use of insulated tools |
| Work at height | 2 class hours | Roof walkways, fall arrest systems, edge protection |
| Installation and lifting | 1 class hour | Module handling, lifting supervision, temporary fixing |
| O&M inspection | 2 class hours | Infrared temperature measurement, connector inspection, cleaning work safety |
Total class hours can be adjusted to the school's training schedule; when compressing, merge awareness modules first and keep hands-on and emergency content.
| Dimension | Form | What is assessed |
|---|---|---|
| Theory | Closed-book, 40 questions | DC-side awareness, voltage testing, fall protection |
| Hands-on practice | Voltage verification and protection | Demonstrate the correct voltage-testing sequence and protective wear |
| Emergency | Scenario judgement | Given an electric-shock / fall scenario, state the response steps |
Failing theory means no hands-on practice; failing practice means retraining. We recommend putting this rule into the practical training regulations.
Send us the school's practical training equipment list and we will return course priorities based on the actual equipment.
Send the equipment list